REFERENCES:

 

1.    PACKAGE PLANTS AND TURN KEY CONSTRUCTION PROJECTS
(DESIGN + CONSTRUCTION + EQUIPMENT SUPPLY)



2.    ENGINEERING and CONSULTANCY PROJECTS

 

 

 

 

 

 

 

 

 

PACKAGE PLANTS AND TURN KEY CONSTRUCTION PROJECTS
(DESIGN + CONSTRUCTION + EQUIPMENT SUPPLY)

 

 

 

Name of Project

:

HAMİTABAD NATURAL GAS POWER PLANT PACKAGE DOMESTIC WASTEWATER TREATMENT PLANT

Employer

:

Turkish Electricity Board

Design Population

:

1000

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

TUSAN HOTEL (KUŞADASI) WASTEWATER TREATMENT PLANT

Employer

:

Tusan Co.

Design Population

:

500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

METEOR HOLIDAY RESORT (BODRUM-AKYARLAR) WASTEWATER TREATMENT PLANT

Employer

:

S.S. Dinlenme Evleri Yapı Koop.

Design Population

:

1000

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

GÜMBET BAY (BODRUM) WASTEWATER TREATMENT PLANT DESIGN AND ELECTROMECHANICAL EQUIPMENT SUPPLY

Employer

:

Ero Construction Co.

Design Population

:

3000

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

ELBİSTAN SUGAR FACTORY COMPLEX

Employer

:

Turkish Sugar Industry Co.

Design Population

:

2500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

CENNETEVLER HOLIDAY RESORT (GÜNDOĞAN-BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

ENA Construction Co.

Design Population

:

1500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

SHELL OIL Co. MEMBERS HOLIDAY RESORT (DATÇA)

Employer

:

İnta Co.

Design Population

:

200

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

SİVAS STEEL MILL WASTEWATER TREATMENT PLANT  DESIGN REVISION AND EQUIPMENT SUPPLY

Employer

:

General Directorate of Turkish Steel Ind.

Design Population

:

2500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

GÜNEŞ HOLIDAY RESORT (DATÇA) WASTEWATER TREATMENT PLANT

Employer

:

İnta Cons. Co.

Design Population

:

500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

BAĞLA HOLIDAY RESORT (BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

S.S. Bağla Koop.

Design Population

:

2000

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

SEMİRAMİS HOLIDAY VILLAGE  (GÜLLÜK-BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

SMT  + H.J. STAGIER & PARTNERS

Design Population

:

3100

Treatment Process

:

Flow equalization + Extended aeration + Chlorination + Pressurised Sand Filter + 800m3 storage tank

 

 

 

 

 

 

Name of Project

:

MİKES MICROWAVE ELECTRONIC PLANT (ANKARA) WASTEWATER TREATMENT PLANT

Employer

:

Metiş Construction Co.

Design Population

:

200

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

PALMA HOLIDAY RESORT (MERSİN) WASTEWATER TREATMENT PLANT

Employer

:

Nizam Architects

Design Population

:

1500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

ESENBOĞA AIRPORT (ANKARA) WASTEWATER TREATMENT PLANT

Employer

:

Ministry of Transportations

Design Population

:

21.000  (50 Lt/s)

Treatment Process

:

Low Rate Activated Sludge + Chlorination + Aerobic Sludge Stabilisation + Sludge Dewat.

 

 

 

 

 

 

Name of Project

:

KAMELYA HOLIDAY RESORT (SİDE) WASTEWATER TREATMENT PLANT

Employer

:

Kamelya III Yapı Kooperatifi

Design Population

:

1000

Treatment Process

:

Flow Equalisation + Activated Sludge + Chlorination + Pressurised Sand Filters

 

 

 

 

 

 

Name of Project

:

TATVAN  (BİTLİS)  WASTEWATER TREATMENT PLANT ELECTROMECHANICAL EQUIPMENT SUPPLY

Employer

:

İller Bankası (Bank of Provinces) + İÇTAŞ Co.

Design Population

:

93.520

Treatment Process

:

-

Electromechanical Equipment

:

- 37 kW Surface Aerator  8 nos.

- 18.5 kW Surface Aerator  4 nos.

 

 

 

 

 

 

Name of Project

:

NİZİP (GAZİANTEP) WASTEWATER TREATMENT PLANT ELECTROMECHANICAL EQUIPMENT SUPPLY

Employer

:

EDA Construction + İller Bankası

Design Population

:

200.000

Treatment Process

:

-

Electromechanical Equipment

:

- 37 kW Surface Aerator  6 nos.

- 18.5 kW Surface Aerator  3 nos.

- 26m diameter Primary Sed.Tank scraper bridges (2 no.s) 

- 26m diameter Secondary Sed.Tank scraper bridges (3 no.s)

- Mechanically cleaned bar screens (2 no.s.)

 

 

 

 

 

 

Name of Project

:

MİLPA HOLIDAY VILLAGE WASTEWATER TREATMENT PLANT

Employer

:

Milliyet Pazarlama

Design Population

:

1800

Treatment Process

:

Equalization + Extended Aeration +Chlorination + Pressurised Sand Filter

 

 

 

 

 

 

Name of Project

:

ABANT İZZET BAYSAL UNIVERSITY WASTEWATER TREATMENT PLANT

Employer

:

İzzet Baysal University + AKAY Const.

Design Population

:

4000

Treatment Process

:

Extended Aeration + Pressurised Sand Filter       

 

 

 

 

 

 

Name of Project

:

BOTAŞ YAPRACIK WATER TREATMENT AND SOFTENING SYSTEMS

Employer

:

BOTAŞ + CNFA Cons.

Design Capacity

:

720 m3/day

Treatment Process

:

Hydroantracit Filter + Water Softening with Ion Exchange

 

 

 

 

 

 

Name of Project

:

TSCHERNORETSCHJE (SAMARA REGION-RUSSIA) MILITARY HOUSING PROJECT, CONSTRUCTION OF SPORTS COMPLEX BUILDING

Employer

:

J.V. HMB Tekfen

Contract Duration

:

9 months

Specification

:

Concrete and steel composite structure with 7000 m2 closed area, a prestigious building.

 

 

 

 

 

 

Name of Project

:

TSCHERNORETSCHJE (SAMARA REGION-RUSSIA) CONSTRUCTION OF CLUB HOUSE

Employer

:

J.V. HMB Tekfen

Contract Duration

:

9 months

Specification

:

Concrete structure with 6 000 m2 closed area,a prestigious building.

 

 

 

 

 

 

Name of Project

:

TSCHERNORETSCHJE (SAMARA REGION-RUSSIA) MILITARY HOUSING PROJECT, CONSTRUCTION OF SERVICE, LAUNDRY AND BAKERY BUILDINGS

Employer

:

J.V. HMB Tekfen

Contract Duration

:

9 months

Specification

:

Three Concrete and steel composite structures with 5500 m2 closed area.

 

 

 

 

 

 

Name of Project

:

JEGORLIKSKAYA (ROSTOV REGION-RUSSIA) MILITARY HOUSING PROJECT CONSTRUCTION OF DOMESTIC WASTEWATER TREATMENT PLANT

Employer

:

J.V. GABEG-ENKA

Design Capacity

:

1500 m3/day

Treatment Process

:

Nitrification-Denitrification + Chemical phosphorus removal + Pressurised filtration + Chlorination + Sludge Thickener + Sludge Drying Beds

Contract Duration

:

7 months

 

 

 

 

 

 

Name of Project

:

JEGORLIKSKAYA (ROSTOV REGION-RUSSIA) MILITARY HOUSING PROJECT CONSTRUCTION OF KINDERGARDEN

Employer

:

J.V. GABEG-ENKA

Contract Duration

:

7 months

Specifications

:

Concrete structure with 3000 m2 closed area, a prestigious building.

 

 

 

 

 

 

Name of Project

:

ŞİRİNGÖLKÖY (ANKARA) VILLAGE WASTEWATER TREATMENT PLANT

Employer

:

Şiringölköy + Artek Co.

Design Population

:

650

Treatment Process

:

Extended aeration + Chlorination + Pressurized Sand Filter +Water Pressurizing System.

 

 

 

 

 

 

Name of Project

:

AKÇABÜK HOLIDAY RESORT (BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

AKYAP CO.

Design Population

:

4500

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

OYAK - RENAULT AUTOMOBILE MANUFACTURING PLANT (BURSA) INDUSTRIAL WASTEWATER TREATMENT PLANT  ELECTROMECHANICAL EQUIPMENT SUPPLY

Employer

:

HIDRO - OTV (France)

Design Capacity

:

-

Treatment Process

:

-

Electromechanical Equipment

:

- Primary sed. Tank scraper + thickener bridge

- Secondary sed. Tank scraper bridge

- DAF equipment

- Mechanically cleaned bar screen

- Basket type manual screens

- Bins (containers) for dewatered sludges

- Bins for screenings

 

 

 

 

 

 

Name of Project

:

YEŞİLYURTLULAR HOLİDAY RESORT (BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

Yeşilyurtlular Koop.

Design Population

:

340

Treatment Process

:

Extended aeration

 

 

 

 

 

 

Name of Project

:

DALYAN  HOLIDAY RESORT(BODRUM) WASTEWATER TREATMENT PLANT

Employer

:

Alfa Cons. Ltd.

Design Population

:

400

Treatment Process

:

Extended aeration

 

 

 

 

 

 

Name of Project

:

İZMİT WATER TREATMENT PLANT, CONSTRUCTION OF CHEMICAL ,CHLORINATION & GENERATOR BUILDINGS, SLUDGE THICKENING TANK

Employer

:

Güriş Construction Co.

Design Population

:

-

Treatment Process

:

-

 

 

 

 

 

 

Name of Project

:

BODRUM - MİLAS AIRPORT WASTEWATER TREATMENT PLANT

Employer

:

Simge Cons. Co.

Design Capacity

:

1000 m3/day

Treatment Process

:

Extended aeration + Nitrification-Denitrification+ Chemical Phosphorus treatment.

 

 

 

 

 

 

Name of Project

:

AKSARAY WATER TREATMENT PLANT

Employer

:

Municipality of Aksaray

Design Population

:

60,000 m3/day

Treatment Process

:

Cascade aeration + Upward flow sludge blanket type clarifiers + rapid sand filters + chlorination.

 

 

 

 

 

 

Name of Project

:

BURSA AIRPORT WASTEWATER TREATMENT PLANT

Employer

:

Tema Construction Co.

Design Population

:

650 m3/day

Treatment Process

:

Extended aeration activated sludge

 

 

 

 

 

 

 

Name of Project

:

BEYŞEHİR WASTEWATER TREATMENT PLANT
(Mechanical and electrical equipment supply, manufacture and installation)

Employer

:

Bank of Proviences + Mesut Yılmaz Cons. Co.

Design Population

:

-

Treatment Process

:

Activated sludge

 

 

 

 

 

 

Name of Project

:

BASRAH (IRAQ) WASTEWATER TREATMENT PLANT
SUPPLY OF ELECTROMECHANICAL EQUIPMENT

Employer

:

Ministry of Municipalities and Works (IRAQ) + YEDAŞ Co.

Design Population

:

700000

Treatment Process

:

Activated sludge

Equipment Capacities

:

- Primary Sed Scrapes                             Ø40m                2 no.

- Seconds Sed Scrapes                            Ø40m              12 no.

- Surface aerators                                    37Kw              32 no.

- Gravity Thickeners                                Ø24m                3 no.

- Adjustable Level Weirs                          L=4m              16 no.

 

 

 

 

 

 

Name of Project

:

ANTS HEADQUARTERS PACKAGE WASTEWATER TREATMENT PLANT

Employer

:

ANTS Co.

Design Population

:

100

Treatment Process

:

SBR Type Biological Treatment

 

 

 

 

 

 

Name of Project

:

KURTALAN CEMENT FACTORY PACKAGE WASTEWATER TREATMENT PLANT

Employer

:

Limak Construction Co.

Design Population

:

500

Treatment Process

:

SBR Type Biological Treatment

 

 

 

 

 

 

Name of Project

:

ANACONDA AIR BASE (BALAD/IRAQ) WASTEWATER TREATMENT PLANT

Employer

:

US Army + Yüksel Co.

Design Population

:

20.000 P.E.

Treatment Process

:

Inlet pump station + equalization tanks + activated sludge + aerobic sludge digestion + disinfection + sludge dewatering.

 

 

 

 

 

 

Name of Project

:

JAF FACILITIES (JORDAN) PACKAGE PLANT FOR GREYWATER TREATMENT and REUSE

Employer

:

Jordan Armed Forces + Aysel Co.

Design Capacity

:

30 m3/hr

Treatment Process

:

Coagulation / flocculation + sedimentation + dissolved air flotation + sand filtration + chlorination

 

 

 

 

 

 

Name of Project

:

SULEIMANI UNIVERSITY (IRAQ) WASTEWATER TREATMENT PLANT

Employer

:

FDC-TEPE Joint Venture

Design Population

:

10.000 P.E.

Treatment Process

:

Activated sludge + aerobic sludge digestion + disinfection + sludge dewatering.

 

 

 

 

 

 

Name of Project

:

ÇATAK (VAN) MUNICIPAL SOLID WASTE COMPOSTING PLANT

Employer

:

Surkal + Municipality of Çatak

Process

:

Sorting + Shredding + Rotating Drum for Mixing and Aerating + Windrows

 

 

 

 

 

 

Name of Project

:

GÜRİŞ CO. CONSTRUCTION CAMP (TRIPOLI/LIBYA)
PACKAGE WASTEWATER TREATMENT PLANT

Employer

:

Güriş Co.

Design Population

:

300

Treatment Process

:

SBR Type Biological Treatment

 

 

 

 

 

 

Name of Project

:

KOYA (KUYSANJAQ/IRAQ) WATER SUPPLY PROJECT

Employer

:

Ministry of Municipalities

Design Capacity

:

30.000 m³/day

Treatment Process

:

Cascade aeration + Rapid Mixing + Flocculators + Radial flow Clarifiers + rapid sand filters + chlorination.

Plant Units

:

- Intake structure + Intake pump station (1200 m³/hr   Hm=270m)

- Low lift pump station (1200 m³/hr   Hm=220m)

- Heybesultan pump station ( 300 m³/hr  Hm=60m)

- Heybesultan Reservoir (10000 m³)

- Hamamoc Reservoir (5000 m³)

- Sheidan Reservoir (5000 m³)

- 30km DN600 PN40 Ductile Iron Pipe

- 10km DN300 PN25 Ductile Iron Pipe

 

 

 

 

 

 

Name of Project

:

ÖZALTIN CO. CONSTRUCTION CAMP (DARNAH/LIBYA)
PACKAGE WASTEWATER TREATMENT PLANT

Employer

:

Özaltın Co.

Design Population

:

600

Treatment Process

:

SBR Type Biological Treatment

 

 

 

 

 

 

Name of Project

:

KOYA (KUYSANJAQ/IRAQ) WATER SUPPLY PROJECT
PLANT OPERATION and MAINTENANCE

Employer

:

Ministry of Municipalities

Design Capacity

:

30.000 m³/day

Treatment Process

:

Cascade aeration + Rapid Mixing + Flocculators + Radial flow Clarifiers + rapid sand filters + chlorination.

 

 

 

 

 

 

Name of Project

:

PIKARON CO. CONSTRUCTION CAMP (MOUSUL/IRAQ)
PACKAGE WATER TREATMENT PLANT

Employer

:

Pikaron Co.

Design Population

:

300

Treatment Process

:

Rapid mix + flocculation + lamella sedimentation + sand filtration + chlorination

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ENGINEERING and CONSULTANCY PROJECTS

 

 

 

Name of Project

:

JUBAIL  (S.ARABIA)  COST GUARD FACILITIES  WASTEWATER TREATMENT PLANT INFRASTRUCTURE PROJECT

Employer

:

Gulf Trading and Agriculture Co.

Design Population

:

100

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

ALİAĞA  (İZMİR) WATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

300.000

Treatment Process

:

1.Phase: Aeration + Rapid Sand Filter + Slow Sand Filter + Chlorination
2.Phase: Aeration + Coagulation-Floculation - Sedimentation + Rapid Sand Filter + Chlorination

 

 

 

 

 

 

Name of Project

:

ZLITEN  (LIBYA) RESIDENTIAL AREA INFRASTRUCTURE

Employer

:

Özdemir Cons. Co.

Design Population

:

2.500

Treatment Process

:

 

Scope of  Work

:

Road, Water, Sewerage, Treatment

 

 

 

Name of Project

:

TİRE  (İZMİR) SEWERAGE PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

70.000

Treatment Process

:

 

Length of Network

:

150 km

Main interceptor

:

2.816 m  Ø 700

 

 

 

 

 

 

Name of Project

:

PRELIMINARY ENGINEERING DESIGNS FOR DOMESTIC WASTEWATER TREATMENT PLANT OF ÇAYIRHAN THERMIC POWER PLANT

Employer

:

Günal Cons. Co.

Design Population

:

1.700

Treatment Process

:

Power Plant : Extended Aeration Residences  : Imhof Tank + Biodisc

 

 

 

 

 

 

Name of Project

:

ESKİKÖY (ORDU) DIVERSION WEIR & WATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

10.000

Treatment Process

:

Plain Sedimentation + Slow Sand Filters + Chlorination

 

 

 

 

 

 

Name of Project

:

KOZAN  (ADANA)  WASTEWATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

145.528

Treatment Process

:

1.Phase: Anaerobic + Facultative
2.Phase: Aerobic  lagoon + Facultative

 

 

 

 

 

 

Name of Project

:

DÜZiÇi  (ADANA)  SEWERAGE PROJECT

 

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

111.000

Treatment Process

:

 

Length of Network

:

300 km

Main Interceptor

:

2.800 m        

 

 

 

 

 

 

Name of Project

:

ŞEFAATLi (YOZGAT)  SEWERAGE PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

40.000

Treatment Process

:

 

Length of Network

:

64 km

Main Interceptor

:

1.600 m

Pumping Station

:

2 nos.  (Hm=25 m , Q=200 Lt/sn)

Main Interceptor

:

1.600 m

 

 

 

 

 

 

Name of Project

:

TERME (SAMSUN) WASTEWATER TREATMENT PLANT PROJECT

Employer

:

Özkar Co. + İller Bankası

Design Population

:

43.000

Treatment Process

:

1.Phase: Facultative Stab. Ponds
2.Phase: Aerobic + Facultative ponds

 

 

 

 

 

 

Name of Project

:

MKE KIRIKKALE WEAPON FACTORY INDUSTRIAL WASTEWATER TREATMENT PLANT PRELIMINARY DESIGNS

Employer

:

BMB Co. 

Design Population

:

 

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

ANTAKYA  WASTEWATER TREATMENT PLANT  PRELIMINARY  DESIGNS

Employer

:

Nurol Construction Co.

Design Population

:

214.000

Treatment Process

:

High Rate Trickling Filter + Aerobic Sludge Stablization

 

 

 

 

 

 

Name of Project

:

ÇUKUROVA  METROPOLITAN REGION URBAN  DEVELOPMENT PROJECT TARSUS URBAN EXPANSION AREA ON AND OFF SITE INFRASTRUCTURE PHASE 1, 2, AND 3 CONSULTANCY AND CONSTRUCTION MANAGEMENT SERVICES

Employer

:

Asfen Construction Co.

Design Population

:

 

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

KARAPÜRÇEK  (BALIKESİR) POTABLE WATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

24.000

Treatment Process

:

Plain Sedimentation + Slow Sand Filters + Chlorination

 

 

 

 

 

 

Name of Project

:

KORGAN(ORDU) POTABLE WATER TREATMENT PLANT  PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

25.000

Treatment Process

:

Plain Sedimentation + Slow Sand Filters + Chlorination

 

 

 

 

 

 

Name of Project

:

NEVŞEHİR RAKI FACTORY  INDUSTRIAL WASTEWATER  TREATMENT PLANT PROJECT  

Employer

:

Nurol Co.

Design Population

:

80.000 

Treatment Process

:

Flow Equalization + Anaerobic Treatment + High Rate + Activated Sludge + Low Rate Activated Sludge

 

 

 

 

 

 

Name of Project

:

SAFMAYA YEAST FACTORY (AMASYA) INDUSTRIAL WASTEWATER  TREATMENT PLANT

Employer

:

Garipoğlu Co.

Design Population

:

200.000

Treatment Process

:

1.Phase: Two stage Activated Sludge + Aerobic Sludge Stabilisation + Sludge Thickening (Completed)
2.Phase:  Addition of equalization tank and intermediate settling units, anaerobic reactor. (Abolished)

 

 

 

 

 

 

Name of Project

:

F.N.S.S.  ARMOURED COMBAT VEHICLE (GÖLBAŞI/ANKARA) WATER QUALITY CONTROL AND CONSULTANCY SERVICES

Employer

:

FMC - Nurol  Co.

Design Population

:

 

Treatment Process

:

 

Scope of Work

:

Geological and hydrological studies of the region, laboratory tests on the samples from deep wells.  Recommendation for the disinfection system.

 

 

 

 

 

 

Name of Project

:

YOZGAT ORGANISED INDUSTRIAL ZONE  WASTEWATER TREATMENT PLANT

Employer

:

Ministry of Industry

Design Population

:

 

Treatment Process

:

Low Rate Activated Sludge + Aerobic Sludge + Stab. + Sludge Digestion + Belt Filter

Design Discharge

:

100 Lt/s

 

 

 

 

 

 

Name of Project

:

ÇERKEZKÖY  (TEKİRDAĞ)  WASTEWATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

250.000

Treatment Process

:

Activated Sludge  

 

 

 

 

 

 

Name of Project

:

NALLIHAN (ANKARA) SEWERAGE PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

50.000

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

ABANT İZZET BAYSAL UNIVERSITY BOLU CAMPUS WASTEWATER TREATMENT PLANT

Employer

:

Izzet Baysal University 

Design Population

:

4.000

Treatment Process

:

Extended Aeration

 

 

 

 

 

 

Name of Project

:

DÖRTYOL (ADANA) WASTEWATER TREATMENT PLANT, FEASIBILITY STUDIES

Employer

:

Municipality of Dörtyol

Design Population

:

140.000  PE (for first stage)

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Biological Phosphorus removal

 

 

 

 

 

 

Name of Project

:

KIRIKHAN (HATAY) WASTEWATER TREATMENT PLANT, FEASIBILITY STUDIES

Employer

:

Municipality of Kırıkhan

Design Population

:

125.000  PE (for first stage)

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Biological Phosphorus removal

 

 

 

 

 

 

Name of Project

:

TÜRKELLİ (TRABZON) WATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası (Bank of Provinces)

Design Population

:

11.000

Treatment Process

:

Plain Sedimentation + Slow Sand Filters + Chlorination

 

 

 

 

 

 

Name of Project

:

ADAPAZARI WASTEWATER TREATMENT PLANT, MAIN COLLECTOR AND REHABILITATION OF ÇARK CREEK CONSULTANCY and CONSTRUCTION SUPERVISION SERVICES

Employer

:

Municipality of Adapazarı – Erge Ltd. Şti.

Design Population

:

1.650.000  PE

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process. 4 km Ø2400 RC Main Collector, 7.4 kmRehabilitation  of Çark Creek.

 

 

 

 

 

 

Name of Project

:

EDİRNE WASTEWATER TREATMENT PLANT, FEASIBILITY STUDIES

Employer

:

Municipality of Edirne

Design Population

:

285.000  PE

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Biological Phosphorus removal

 

 

 

 

 

 

Name of Project

:

KONYA WASTEWATER TREATMENT PLANT, FEASIBILITY STUDIES

Employer

:

Municipality of Konya

Design Population

:

650.000  PE (for first stage)

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Biological Phosphorus removal

 

 

 

 

 

 

Name of Project

:

MERCEDES-BENZ(AKSARAY-TURKEY) INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT FEASIBILITY PROJECT

Employer

:

 

Design Population

:

600m3/day ind.ww + 400 m3/day domestic.

Treatment Process

:

Equalization + Chemical treatment processes + Biological traetment processes

 

 

 

 

 

 

 

Name of Project

:

AYTAÇ POULTRY PLANT INDUSTRIAL WASTEWATER TREATMENT PLANT FEASIBILITY PROJECT

Employer

:

 

Design Population

:

2500m3/day

Treatment Process

:

Equalization + Chemical treatment processes (flocculation+settling+DAF)+ Biological traetment processes

 

 

 

 

 

 

Name of Project

:

ÇINARCIK (YALOVA) WASTEWATER  TREATMENT PLANT AND SEA OUTFALL PROJECT

Employer

:

İller Bankası (Bank of Provinces) + Özbek Co. 

Design Population

:

230.000 P.E

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process

 

 

 

 

 

 

Name of Project

:

ESENKÖY (YALOVA) WASTEWATER TREATMENT PLANT AND SEA OUTFALL PROJECT

Employer

:

İller Bankası (Bank of Provinces) + Özbek  Co. 

Design Population

:

47.000 P.E

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process

 

 

 

 

 

 

Name of Project

:

AKYAKA – GÖKOVA (MUĞLA) WASTEWATER TREATMENT PLANT PROJECT

Employer

:

Ministry of Environment, Specially Protected Areas

Design Population

:

30.000  P.E.

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Phosphorus removal + Disinfection + Sludge dewatering

 

 

 

 

 

 

Name of Project

:

PAMUKKALE (DENİZLİ) WASTEWATER TREATMENT PLANT PROJECT

Employer

:

Ministry of Environment, Specially Protected Areas

Design Population

:

26.300  P.E.

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Phosphorus removal  + Disinfection + Sludge dewatering

 

 

 

 

 

 

Name of Project

:

AKKÖY (DENİZLİ) WASTEWATER TREATMENT PLANT PROJECT

Employer

:

Ministry of Environment, Specially Protected Areas

Design Population

:

49.400  P.E.

Treatment Process

:

Extended Aeration Activated Sludge + Nitrification + Denitrification Process + Phosphorus removal +  Disinfection + Sludge dewatering

 

 

 

 

 

 

Name of Project

:

GÖCEK (MUĞLA) WASTEWATER TREATMENT PLANT

Employer

:

Ministry of Environment, Specially Protected Areas

Design Population

:

12000 PE

Treatment Process

:

Activated sludge (Sequencing Batch Reactor)

 

 

 

 

 

 

Name of Project

:

AKSARAY WASTEWATER TREATMENT PLANT

Employer

:

Ministry of Environment

Design Population

:

250.000 P.E.

Treatment Process

:

Nitrification + Denitrification + Biological Phosphorus Removal + Sludege Dewatering

 

 

 

 

 

 

Name of Project

:

BASRAH (IRAQ) WASTEWATER TREATMENT PLANT DESIGN REVISIONS

Employer

:

Ministry of Municipalities and Works (IRAQ) + YEDAŞ Co.

Design Population

:

700.000 P.E.

Treatment Process

:

Activated Sludge + Anaerobic Sludge Digestion +  Gas Store Tanks, Sludge Dewatering

 

 

 

 

 

 

Name of Project

:

KHOST ANABRIGADE (AFGANISTAN) WASTEWATER TREATMENT PLANT

Employer

:

U.S. Army + Yüksel Co.

Design Population

:

3000 P.E.

Treatment Process

:

Aerated lagoons

 

 

 

 

 

 

Name of Project

:

ILICA (ANTALYA) WATER and SEWERAGE PROJECT CONSULTANCY and CONSTRUCTION     SUPERVISION SERVICE (Funded by the World Bank)

Employer

:

Ilıca Municipality

Design Population

:

12.112 m HDPE water pipes,

18.269m HDPE sanitary sewage pipes,

7.236m Concrete stormwater pipes,

1 no. sewerage pump station,

277m forced main.

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

BURSA WASTEWATER TREATMENT PLANTS CONSULTANCY and CONSTRUCTION  SUPERVISION SERVICE

Employer

:

Bursa Water and Sewerage Authority + Yüksel Co.

Design Population

:

- East Treatment Plant                           : 1.550.000 PE

- West Treatment Plant                          : 650.000 PE

- Leachete Treatment Plant leachate from

- 25 million tons of landfill.

Treatment Process

:

 

Ekotek Scape              

:

40 man mounths of experts service for study and approval of process and mechanical designs. 

 

 

 

 

 

 

Name of Project

:

ELBİSTAN WASTEWATER TREATMENT PLANT PROJECT

Employer

:

İller Bankası

Design Population

:

133.000 PE

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

HASANOĞLAN WASTEWATER TREATMENT PLANT PROJECT

Employer

:

ASKİ (Ankara Water and Sewerage Authority) + Yüksel Co.

Design Population

:

100.000 PE

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

ANKARA CREEK WATER QUALITY IMPROWEMENT PROJECT

Employer

:

ASKİ (Ankara Water and Sewerage Authority) + Yüksel Co.

Design Population

:

6 m3/sec

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

SİLOPİ POWER PLANT RAW WATER TREATMENT PLANT PROJECT

Employer

:

PARK HOLDİNG + Eser Co.

Design Population

:

630 m3/hr

Treatment Process

:

 

 

 

 

 

 

 

Name of Project

:

AL QARABULI (LIBYA) WASTEWATER TREATMENT PLANT

Employer

:

TABAK Co.

Design Population

:

2000 m3/day

Treatment Process

:

 

 

 

 

EKOTEK © 2015